Optimization of multistage membrane distillation system for treating shale gas produced water

Empreu sempre aquest identificador per citar o enllaçar aquest ítem http://hdl.handle.net/10045/90149
Registre complet
Registre complet
Camp Dublin Core Valor Idioma
dc.contributorComputer Optimization of Chemical Engineering Processes and Technologies (CONCEPT)es_ES
dc.contributorEstudios de Transferencia de Materia y Control de Calidad de Aguas (ETMyCCA)es_ES
dc.contributor.authorCarrero-Parreño, Alba-
dc.contributor.authorOnishi, Viviani C.-
dc.contributor.authorRuiz-Femenia, Rubén-
dc.contributor.authorSalcedo Díaz, Raquel-
dc.contributor.authorCaballero, José A.-
dc.contributor.authorLabarta, Juan A.-
dc.contributor.otherUniversidad de Alicante. Departamento de Ingeniería Químicaes_ES
dc.contributor.otherUniversidad de Alicante. Instituto Universitario de Ingeniería de los Procesos Químicoses_ES
dc.date.accessioned2019-03-25T08:28:12Z-
dc.date.available2019-03-25T08:28:12Z-
dc.date.issued2019-06-15-
dc.identifier.citationDesalination. 2019, 460: 15-27. doi:10.1016/j.desal.2019.03.002es_ES
dc.identifier.issn0011-9164 (Print)-
dc.identifier.issn1873-4464 (Online)-
dc.identifier.urihttp://hdl.handle.net/10045/90149-
dc.description.abstractThermal membrane distillation (MD) is an emerging technology to desalinate high-salinity wastewaters, including shale gas produced water to reduce the corresponding water footprint of fracturing operations. In this work, we introduce a rigorous optimization model with energy recovery for the synthesis of multistage direct contact membrane distillation (DCMD) system. The mathematical model (implemented in GAMS software) is formulated via generalized disjunctive programming (GDP) and mixed-integer nonlinear programming (MINLP). To maximize the total amount of water recovered, the outflow brine is fixed close to salt saturation conditions (300 g·kg−1 water) approaching zero liquid discharge (ZLD). A sensitivity analysis is performed to evaluate the system's behavior under different uncertainty sources such as the heat source availability and inlet salinity conditions. The results emphasize the applicability of this promising technology, especially with low steam cost or waste heat, and reveal variable costs and system configurations depending on inlet conditions. For a produced water salinity ranging from 150 g·kg−1 water to 250 g·kg−1 water based on Marcellus play, an optimal treating cost are between 11.5 and 4.4 US$ m−3 is obtained when using low-cost steam. This cost can decrease to 2.8 US$ m−3 when waste heat from shale gas operations is used.es_ES
dc.description.sponsorshipThis project has received funding from the European Union's Horizon 2020 Research and Innovation Program under grant agreement No. 640979.es_ES
dc.languageenges_ES
dc.publisherElsevieres_ES
dc.rights© 2019 Elsevier B.V.es_ES
dc.subjectShale gas wateres_ES
dc.subjectZero liquid discharge (ZLD)es_ES
dc.subjectMembrane distillationes_ES
dc.subjectOptimal configurationes_ES
dc.subject.otherIngeniería Químicaes_ES
dc.titleOptimization of multistage membrane distillation system for treating shale gas produced wateres_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.peerreviewedsies_ES
dc.identifier.doi10.1016/j.desal.2019.03.002-
dc.relation.publisherversionhttps://doi.org/10.1016/j.desal.2019.03.002es_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.relation.projectIDinfo:eu-repo/grantAgreement/EC/H2020/640979es_ES
Apareix a la col·lecció: Investigacions finançades per la UE
INV - ETMyCCA - Artículos de Revistas
INV - CONCEPT - Artículos de Revistas

Arxius per aquest ítem:
Arxius per aquest ítem:
Arxiu Descripció Tamany Format  
Thumbnail2019_Carrero_etal_Desalination_final.pdfVersión final (acceso restringido)2,41 MBAdobe PDFObrir     Sol·licitar una còpia
Thumbnail2019_Carrero_etal_Desalination_preprint.pdfPreprint (acceso abierto)1,68 MBAdobe PDFObrir Vista prèvia


Tots els documents dipositats a RUA estan protegits per drets d'autors. Alguns drets reservats.