Building Information Modelling in Operations of Maintenance at the University of Alicante

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10045/73610
Información del item - Informació de l'item - Item information
Título: Building Information Modelling in Operations of Maintenance at the University of Alicante
Autor/es: Galiano-Garrigós, Antonio | Andújar-Montoya, María Dolores
Grupo/s de investigación o GITE: Tecnología y Sostenibilidad en Arquitectura
Centro, Departamento o Servicio: Universidad de Alicante. Departamento de Construcciones Arquitectónicas | Universidad de Alicante. Departamento de Edificación y Urbanismo
Palabras clave: Building information modelling | BIM | Building maintenance
Área/s de conocimiento: Construcciones Arquitectónicas
Fecha de publicación: 2018
Editor: WIT Press
Cita bibliográfica: International Journal of Sustainable Development and Planning. 2018, 13(1): 1-11. doi:10.2495/SDP-V13-N1-1-11
Resumen: The benefits derived from the use of building information Modeling (BIM) methodologies are a current issue in the field of research in both design and construction phase. However, the profits achieved in the maintenance stage are still an almost unexplored issue. This fact is especially relevant in public organizations, in particular on university campuses where the building assets are a value added service that must maintain their quality. In this connection, this paper aims to restructure the current maintenance operations at Alicante University and focus them towards BIM environments. It identifies the current building maintenance process on campus, determining the problems it faces since an incident occurs until it resolves. To this end, the research methodology includes semi structured surveys, interviews and benchmarking sessions with technical office staff, managers and maintenance workers at the University of Alicante together with relevant external stakeholders. Consequently, all the information obtained will enable a better procedure based on BIM for improving both preventive and corrective maintenance. The study case is focused on the renovation of the building Former Faculty of Education at The University of Alicante and the results confirm the potential of implementing BIM on campus through a more accurate access to information that optimizes and speeds up the maintenance process.
URI: http://hdl.handle.net/10045/73610
ISSN: 1743-7601 (Print) | 1743-761X (Online)
DOI: 10.2495/SDP-V13-N1-1-11
Idioma: eng
Tipo: info:eu-repo/semantics/article
Derechos: © 2018 WIT Press
Revisión científica: si
Versión del editor: https://www.witpress.com/elibrary/sdp-volumes/13/1/1786
Aparece en las colecciones:INV - TSA - Artículos de Revistas
INV - Undefined - Artículos de Revistas

Archivos en este ítem:
Archivos en este ítem:
Archivo Descripción TamañoFormato 
Thumbnail2018_Galiano_Andujar_IntJSusDevPlann.pdf2,91 MBAdobe PDFAbrir Vista previa


Todos los documentos en RUA están protegidos por derechos de autor. Algunos derechos reservados.